Aqua Lung SECOND STAGE Service Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 19
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
FIRST TO DIVE 9
2. Check opening effort. Apply a gradual inhalation
effort. When the MP starts to fall, release the pressure
and compare the result with the limits shown in Table 5.
Checking Specifications. If the opening effort is
outside these limits consult Table 1. Troubleshooting
Guide.
If the adjusting screw 127823 is not correctly adjusted,
unscrew it until its stop and then screw it to one turn and
3/4 turn. You have the possibility to screw and unscrew
of +/- 1/2 turn from this position to get the suitable
cracking effort.
3. Check depression / flow. Apply an inhalation flow of
400 l/min and check that the depression does not
exceed 15 mbar. If it exceeds this value consult Table 1.
Troubleshooting Guide.
4. Check for leaks. Connect the first stage to a cylinder
charged to 200 bar, open the valve and submerge the
assembly in a bath of water for 1 minute. Check that
there are no leaks. If there are apparent leaks,
disassemble the 2
nd
stage completely and check all
sealing surfaces and the positioning of the parts.
END OF REASSEMBLY
Note: Tests 2,3 et 4 require the use of
a regulator test bench.
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 18 19

Comments to this Manuals

No comments