Aqua Lung SECOND STAGE Service Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 19
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
FIRST TO DIVE 7
11. Maintain the lever in the upper position. Push slightly the
assembly outside the casing, and screw the valve
spindle screw until its stop.
12. Line up the spins of the screw with the seating of the
casing by unscrewing the valve spindle screw. Looking
at the case as the pictures, the two upper spins and the
lever must be on both sides of a vertical plan.
13. Re-fit completely the assembly into the casing.
14. Fit a new lubricated O-ring (124706) on the valve
spindle, then screw and tight the screw (127818) to 0.3
m.kg.
15. Fit a new lubricated O-ring (444243) on the
seat(AP2033). Fit the seat (threaded part first) into the
insert and push it fully home using a screwdriver.
16. With the flat side of the casing at eye level, screw in the
adjusting knob until the lever is about 4mm below the
level of the casing edge. Now unscrew it until the lever
just shows above the edge of the casing. Press on the
lever and check that it returns to the high position (the
sign that the shuttle valve is well positioned).
17. Fit new lubricated O-rings on the hose nipple and on the
thread.
18. Ajustement du Levier (129178).
Attach the adjusting connector (122041) on the
adjustment tool (122046). Connect a MP hose to the
tool and then fit the assembly to a Mikron 1st stage that
has its MP set to 9.5 bar. Put the regulator under
pressure.
Slide the tool (129001) across the top of the casing.
With the tool in MINI position
:
- the 2
nd
stage MUST NOT leak
- the tool MUST NOT press on the lever
- the tool MUST flush the lever
Screw the seat in or out to adjust the setting.
The tool (129001) in its MAXI position
MUST NOT BE USED TO ADJUST THE
MIKRON SECOND STAGE
.
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 18 19

Comments to this Manuals

No comments