20 SEA USER'S MANUAL
NOTE: If the second stage purge was checked during the
lling procedure, it is not necessary to repeat steps 7 & 8.
5. Closely examine the pressure
indicator dial to determine whether
the needle is within the green zone,
indicating that the SEA cylinder is full.
6. If equipped with a pin indicator, the pin
should be exposed. If the pressure indicator
does not indicate that the cylinder is completely
full, repeat the lling procedure using a supply
cylinder that is lled to 3,000 PSI / 206 BAR.
7. Remove the protective retainer cover, immerse the SEA in water to
check for any signs of freeow from the second stage, or leakage from
the hose, pressure gauge, safety disc assembly, rst stage, or cylinder
neck. If leakage is found, do not attempt to use the SEA until it has re-
ceived service from a qualied technician. When complete, remove the
water from the SEA 1st & 2nd stages and reinstall the retainer cover.
8. Briey depress the purge button to ensure that sufcient airow is
provided to clear the second stage of water (N/A to PN 108382 & PN
108545).
9. Immediately after releasing the purge button, listen closely to ensure
that the second stage does not continue to allow any air ow.
10. Turn the valve handwheel clockwise until it is completely closed. In
the closed position, the red indicator ring is visible in the handwheel.
Provided that these pre-issue inspection requirements have all been met,
the SEA is now ready for use.
Comments to this Manuals